A track record built on landmark projects - from national road bridges to water treatment plants, towering commercial developments to marine structures.
Landmark Project
Strutie Group served as Lead Structural Engineer for the Jewellery Manufacturing Precinct top structures, a landmark commercial development comprising 6 buildings ranging from 3 to 5 storeys each, all constructed using concrete frame technology on a 38,000 sqm footprint.
This project represented one of the highest-value single mandates in Strutie's portfolio and demonstrated our capacity to manage complex, multi-building developments with multiple concurrent structural design packages.
All Projects
Addition of atrium from 4th to 10th floors. Full structural design, analysis, design review and stability design for this complex rehabilitation project.
General consulting engineering services and structural fire engineering assessment for SASOL's maintenance and rehabilitation programme across multiple facilities.
4-storey concrete frame building (Block A, ±1,380 m²) and 2-storey concrete frame building with basement (±1,300 m²). Total ±2,000 sqm.
Pump station structure design at river abstraction for the Beaufort Bulk Water Scheme — a major municipal water supply infrastructure project.
Design and construction supervision for the new Sunny Ridge elevated water tower (1.5 ML capacity) in Ekurhuleni — serving thousands of residents.
Full structural engineering for upgrade including inlet works, primary settling tank, bioreactor, secondary clarifiers, chlorination tank, digesters, and sludge drying beds.
20 ML/D plant in Rand West Municipality. Full structural design across: inlet works, primary settling tanks, AS reactors, secondary clarifiers, digesters, dewatering building and sludge beds.
Structural engineering for 1 ML and 3.5 ML reservoirs, plus upgrade of Mayflower WTP (ZAR 60M) including chlorine building, clear water pump station, flocculation tank and sundry structures.
Widening of N1 Winelands, Cape Town: Kuilsrivier Bridge N&S Bound, Kraaifontein Rail Bridge, Bree Street pedestrian bridge rehab, new Okavango pedestrian bridges (cable-stayed, girder, arch), Brackenfell post-tensioned beam bridge, and 4 major culverts.
Upgrading of R24 Section 1 (Oorsaak Rd to NW/Gauteng border): 1 Cut-and-Cover Tunnel, 4 Bridges, 8 Major Culverts across 32.6 km of national road.
Sub-consultant for pedestrian and vehicle bridges: 94.2 km of new/upgraded feeder roads, 4 pedestrian bridges (250–750 m long) and 6 vehicle bridges (72–422 m long).
Jabavu culvert (25m × 11m skew), Robert Broom culvert, and Chris Hani Bridge (5 spans, 82m) rehabilitation and widening — adding an extra lane on each carriageway.
Improvement on N10 between Vaalkoppies and Upington (km 100–116.7): 7 Bridges including crossings over the Senqu River, and 7 Major Culverts.
Structural assessment and rehabilitation of a historic steel bridge over the Buffalo River. Original bridge built in 1909 — a heritage infrastructure challenge requiring specialist expertise.
Appointed as structural engineer to evaluate structural integrity of South African Reserve Bank buildings nationally (Cape Town, Durban, Johannesburg) for the solar and backup power system upgrade programme.
Appointed as structural engineers for the marine retaining wall in Port Nolloth, Northern Cape Coast. Scope also included a pedestrian bridge over an estuarine in the Western Cape.
Specialist structural audits, compliance assessments, structural rehabilitation, and greenfield and brownfield mining structure design and engineering across South Africa's mining sector.
Project Gallery




















Who We Serve
Trusted by leading public institutions, municipalities, mining companies, and private sector developers across South Africa.
Your Project Next
From bridges to buildings, water treatment to marine structures — we have the expertise to deliver your next project with excellence.